Construction of the comfort-class residential complex “Svyatobor Park Resort” by City One Development is ongoing. While construction workers continue to build cozy homes for future residents, we have prepared a new report from construction sites of phases 6 and 7:

Phase 6:

In section 4, concrete pouring of the fifth floor slab has been completed, and reinforcement for the sixth floor construction has been installed. Construction of the fourth floor has been completed in section 3. Installation of formwork for pouring the fifth floor slab has commenced.

Phase 7:

Formwork has already been installed in section 3, and everything is prepared for concrete pouring on the 12th floor. In section 2, formwork has also been installed, and preparatory work for pouring concrete on the 11th floor (floor of the 12th floor) has been completed. Formwork installation for pouring the 11th floor slab has been completed in section 1. Brickwork has been completed in sections 1 and 2 up to the 5th floor. There is a special offer for 2 and 3-bedroom apartments – only a 20% down payment required!

We invite you for a professional consultation at the sales department located at Lvivska Street, 15-B.

For more detailed information, please contact us at +38 097 259 39 52, +38 067 583 30 40 or visit our website at: https://svyatobor.kiev.ua/