Here is the November construction report for stages 6 and 7 of the complex:
Stage 6
- Section 3: Started concrete work on the vertical elements of the second floor. We are constructing the ceiling structures for the third floor.
- Section 4: Conducting concrete work on the ceiling slab between the fourth and fifth floors.
- Between Sections 3 and 4: Insulating the inter-sectional joints.
Stage 7
- Section 3: Completed pouring the ceiling slab between the 10th and 11th floors. We are conducting concrete work on the vertical elements of the load-bearing structures on the 11th floor.
- Section 2: Conducting reinforcement work for the ceiling slab of the 10th floor.
- Section 1: Completed concrete work on the ceiling slab between the 9th and 10th floors.
- Completed brickwork on the third and fourth floors of all three sections.