Despite the challenges of the present day, the investment and development company City One Development continues to confidently move forward, developing the comfort-class residential complex “Svyatobor Park Resort.”

Here is the November construction report for stages 6 and 7 of the complex:

Stage 6

  • Section 3: Started concrete work on the vertical elements of the second floor. We are constructing the ceiling structures for the third floor.
  • Section 4: Conducting concrete work on the ceiling slab between the fourth and fifth floors.
  • Between Sections 3 and 4: Insulating the inter-sectional joints.

Stage 7

  • Section 3: Completed pouring the ceiling slab between the 10th and 11th floors. We are conducting concrete work on the vertical elements of the load-bearing structures on the 11th floor.
  • Section 2: Conducting reinforcement work for the ceiling slab of the 10th floor.
  • Section 1: Completed concrete work on the ceiling slab between the 9th and 10th floors.
  • Completed brickwork on the third and fourth floors of all three sections.

Apartment sales for both stages are ongoing. You can choose your dream apartment with a park view at the sales center located at 15-B Lvivska Street.

For more detailed information, please contact us at +38 (044) 225 1 225 or visit Svyatobor Park Resort.