City One Development, an investment and development company, continues to create a comfortable and cozy environment for living. With each passing day, the progress of the 7th and 8th phases is noticeable, so that soon the future residents will become a part of the large family of “Novopecherski Lypky” residential complex.
Here is a new report from the construction sites:
7th Phase (Building Numbers 1, 2, 3, 4):
Building No. 1
- Completion of the installation of engineering networks for water supply and drainage, as well as low-voltage alarm and automation systems.
- Continued installation of entrance doors to apartments.
- Finalizing work on insulating the building with non-combustible mineral wool and installing profiles for facade fastening.
- Installation of ventilated facade is nearly 80% complete.
- Ongoing installation of handrails for cold transition staircases.
- Completion of window glazing and installation of aluminum window frames.
Building No. 2
- Completion of installation of fire safety systems, heating, sewage, and water supply in the parking area between buildings 2 and 3.
- Finalizing work on engineering networks for water supply and drainage, low-voltage alarm and automation systems, and pump systems for water supply.
- Continuing work on insulating the building with mineral wool, fastening protective geomembrane, and installing ventilated facade.
- Installation of aluminum window frames and glazing of facade elements in progress.
Building No. 3
- Completion of insulation with non-combustible mineral wool and installation of ventilated facade.
- Continued installation of engineering networks for water supply and drainage, low-voltage alarm and automation systems, and inflow-exhaust ventilation.
- Ongoing installation of aluminum window frames and glazing of facade elements.
Building No. 4
- Completion of installation of aluminum window frames and glazing of window elements on the facade.
- Continued installation of entrance doors to apartments.
- Completion of installation of engineering networks for water supply and drainage, as well as low-voltage alarm and automation systems.
8th Phase (Building Numbers 5, 6, 9):
Club Format Building No. 9
- Completion of masonry of internal walls in the underground parking.
- Continued installation of elevator cabins and technological elevator equipment.
- Completion of installation of water supply, sewage, and ventilation systems on the floors.
- Ongoing installation of systems: fire safety, alarm, dispatching, and automation.
Building No. 6
- Construction of the monolithic frame of the building at levels 12-13 in progress.
- Continued masonry of external and internal walls on levels 8-9.
- Continued development of underground parking for buildings No. 5-6.
Building No. 5
- Installation of ventilation systems and installation of water supply and sewage risers.
- Installation of systems: fire safety, alarm, dispatching, and automation in progress.
- Continued installation of elevator cabins and technological elevator equipment.